
Sprinkler System Installation and Inspections
Sprinkler System supply
- Pre-action
- Wet-pipe
- Dry-pipe
- Deluge
Installation
- Installations – new, retrofit and upgrades. Meet safety codes, local by-laws.
Inspections
- Annual inspection per NFPA 25.
- Test all riser and field devices including tamper switches, low pressure switches, and pressure type water flow switches
- Complete water flow system activation by opening the inspectors test valve “ITV” on each system.
- Complete a main drain flow test to confirm the water supply to the building and flush the lines.
- Check the operation of the water motor gong, 110-volt electric bell and the excess pressure pump and accessories.
- Complete a visual inspection of the entire building to confirm coverage and installation.
- Complete an inspection report detailing all equipment, devices and the result of the inspection and testing.
- Complete a report on all deficiencies, remarks and recommendations for the system tested.
Maintenance and repairs
- Due to age and/or corrosion
- Leaks, sprinkler heads, pipe damage